CENTRAL AIR CONDITIONER WITH ELECTRONIC CONTROL INSTALLATION INSTRUCTIONS
CENTRAL AIR CONDITIONER WITH ELECTRONIC CONTROL SPLIT SYSTEM SERIES DNG INSTALLATION INSTRUCTIONS … Getting started… Carry out test running to confirm that no abnormality occurs after the installation. Then, explain to user the operation, care and maintenance as stated in instructions. Please remind the customer to keep the operating instructions for future reference. 15. Torque wrench 18 N m (1.8 kgf.m) 45 N m (4.5 kgf.m) 65 N m (6.5 kgf.m) 75 N m (7.5 kgf.m) 85 N m (8.5 kgf.m) 1. Screw driver 2. Electric drill, hole core drill ( 60 mm) 3. Hexagonal wrench 4. Spanner 5. Pipe cutter 6. Reamer 7. Knife 8. Gas leak detector 9. Measuring tape 10. Thermometer 11. Megameter 12. Multimeter 13. Vacuum pump 14. Gauge manifold (for R-410A)…
THIS AIR CONDITIONER ADOPTS THE NEW HFC REFRIGERANT (R410A) WHICH DOES NOT DESTROY OZONE LAYER. R410A refrigerant is apt to be affected by impurities such as water, oxidizing membrane, and oils because the working pressure of R410A refrigerant is approx. 1.6 times of refrigerant R22. Accompanied with the adoption of the new refrigerant, the refrigeration machine oil has also been changed. Therefore, during installation work, be sure that water, dust, former refrigerant, or refrigeration machine oil does not enter into the new type refrigerant R410A air conditioner circuit. To prevent mixing of refrigerant or refrigerating machine oil, the sizes of connecting sections of charging port on main unit and installation tools are different from those used for the conventional refrigerant units. Accordingly, special tools are required for the new refrigerant (R410A) units. For connecting pipes, use new and clean piping materials with high pressure fittings made for R410A only. R410A Air Conditioner Installation ….
Download CENTRAL AIR CONDITIONER WITH ELECTRONIC CONTROL INSTALLATION INSTRUCTIONS.Pdf
Can i get detailed electronic control card circuit diagrams for panasonic,easy cool and allair split units.